|
(D&B)= Drill and Blast Excavation/tunneling
(HR) = Hard
Rock TBM (SG) = Soft
Ground TBM
(R&L)=Ribs and Lagging
(LC)=Live Connection
(OC)=Open Cut (SP)=Steel
Pipe
(SL)=Segment Lining (CIP)=Cast
in Place Lining (RCP)=Reinforced
Concrete Pipe
(PJ)=Pipe Jacking
PROJECT NAME
|
LOCATION
|
DURATION
|
COST
|
|
|
|
|
May
86-June 89
|
|
|
Southwest
Interceptor No. 4 (HR)
(CIP)
|
Cleveland,
OH
|
June
87-June 89
|
$9,856,180
|
|
Trinity
Water Distribution System
(SG) (R&L)
|
Houston,
TX
|
Dec.
88-May 90
|
$7,288,166
|
|
Holland
Road Storm, Phase 1 (PJ)
|
Brookpark,
OH
|
June
89-Aug. 89
|
$350,000
|
|
Southwest
Interceptor No. 6 (HR)
(SG) (CIP)
|
Cleveland,
OH
|
June
89-Aug. 91
|
$12,475,522
|
|
Minneapolis
East Interceptor (SG)
(R&L) (CIP)
|
|
Jan.
90-May 92
|
$16,582,737
|
|
Evanston
Basin S06 & S13 (SG)
(CIP)
|
Evanston,
IL
|
Aug.
91-Nov. 93
|
$13,695,560
|
|
West
Leg Interceptor, Contract 2 (SG)
(R&L) (CIP)
|
Cleveland,
OH
|
Sept.
91-Nov. 93
|
$14,070,309
|
|
Quarry
Flood Control, No. 1 (D&B)
(CIP) (RCP)
|
Elmhurst,
IL
|
Mar.
93-Dec. 93
|
$2,107,305
|
|
Inland
System Renovation (D&B)
(SP) (LC)
|
Birmingham,
AL
|
Feb.
94-Apr. 96
|
$12,034,988
|
|
Warwick
Shaft Reclamation
|
Salem,
OH
|
May
94 – Sept. 94
|
$46,000
|
|
Alki
Transfer Project (SG)
(SL)
|
Seattle,
WA
|
Feb.
95-Feb. 97
|
$22,085,608
|
|
Upper
West Scioto Interceptor (HR) (RCP)
|
Columbus,
OH
|
Nov.
95 – Dec. 98
|
$17,700,000
|
|
Twelfth
Street Sewer Separation (SG) (R&L) (RCP)
|
Columbus,
OH
|
June
96-Aug. 96
|
$1,099,143
|
|
Big
Creek Interceptor (SG)
Hobas Pipe
|
Brooklyn,
OH
|
Sept.
95 – Sept. 99
|
$16,600,000
|
|
ERSP6A
(D&B)(SG)(CIP) (RCP)(LC)
|
Evanston,
IL
|
March
99 – Dec. 01
|
|
|
W.
Frankfort Storm Drainage (D&B)
|
Frankfort,
KY
|
June
99 – Dec. 00
|
$5,680,000
|
|
|
|
|
|
|
|
|
|