Project Name: Inland System Renovation
Location: Birmingham, AL
Owner: City of Birmingham, AL
Engineer: Christy Cobb, Inc.
Tunnel Dimensions: 1,530' x 84" I.D.
Excavation Method: Drill and blast
Tunnel Initial Support: Rockbolts
Tunnel Final Support: Steel pipe grouted in place
Structures: Spillway Modifications, Outfall structure and 165' tall Marine Intake Structure
Geology: Sandstone
Dates: February 1994 - September 1996




Download

Inland System.pdf (103 KB)